Skip to main content
Projects
Projects

Liquid Oxygen Facility

This project was implemented for the Iraqi Air Force with the assistance of the Transition Team, Lockheed Martin and CCE. The project included masonry work, reinforcement of existing steel structures, and installation of 4,000 PSI concrete slabs. An entire electrical wiring system was installed and connected to a stub point located on site for future connection options so that the site can safely be used to store oxygen in a secure area.

Liquid Oxygen Facility
Newsletter Subscribe To Receive New Information