The project was to perform a complete site survey of the entire Australian Embassy that included oversize scale shop and AutoCAD drawings and entailed exact points indicating relevant further steps in term of locations of the Australian Government in Canberra. This project also included site elevation, layouts of all existing facilities that significantly contributed to the planning of the new additions of the embassy. The above was followed by the task to provide accurate planning assessment, interior wall-, demo- and rebuilding, the installation of bathrooms and piping to existing septic, electrical relocation, carpentry and drop ceiling works along with the final As-Built drawing to include excellent logistics coordination for the entering vehicles. This project was also set by International Building Code Standards.